
Indian Railways operates some of the most prestigious train services, including Vande Bharat Express, Rajdhani Express, and Shatabdi Express. These premium trains are known for their speed, comfort, and modern amenities, but have you ever wondered what it takes to run them per kilometer? This article breaks down the operational costs, fuel consumption, energy efficiency, and maintenance expenses of these trains.
What It Takes to Run Vande Bharat
Factor | Vande Bharat Express | Rajdhani Express | Shatabdi Express |
---|---|---|---|
Average Speed | 130-160 km/h | 130 km/h | 110-130 km/h |
Energy Source | Electric (25kV AC) | Diesel/Electric | Diesel/Electric |
Cost per km (Estimate) | ₹500-₹750/km | ₹400-₹600/km | ₹350-₹550/km |
Maintenance Cost per Coach (Annual) | ₹12-15 lakh | ₹10-12 lakh | ₹8-10 lakh |
Passenger Capacity | 1,128 (16-coach) | 960-1,200 | 750-1,000 |
Ticket Revenue per km | ₹700-₹1,200/km | ₹600-₹1,000/km | ₹500-₹900/km |
Running Vande Bharat, Rajdhani, and Shatabdi per kilometer involves energy costs, maintenance, staff salaries, infrastructure upkeep, and passenger services. While Vande Bharat is more energy-efficient, Rajdhani and Shatabdi remain essential for long-distance and medium-distance travel. Indian Railways continues modernizing its fleet, ensuring faster, safer, and more comfortable journeys for passengers.
Understanding the Costs of Running Premium Trains
Running high-speed, long-distance trains like Vande Bharat, Rajdhani, and Shatabdi involves significant costs, including:
- Energy/Fuel Consumption
- Maintenance & Repairs
- Staff Salaries
- Infrastructure & Track Costs
- Technology & Safety Systems
- Catering & Passenger Services
- Environmental Impact & Sustainability Measures
1. Energy and Fuel Consumption
Vande Bharat Express (Electric Only)
- Runs on electricity (25kV AC overhead), making it more energy-efficient than diesel.
- Consumes approximately 3.8-4.5 kWh per km per coach, translating to 60-72 kWh per km for a 16-coach rake.
- Electricity cost: ₹6-₹8 per kWh → ₹360-₹576 per km.
Rajdhani & Shatabdi Express (Diesel & Electric)
- Uses both diesel and electric locomotives, depending on route electrification.
- Diesel locomotives consume around 4.5-5 liters per km (₹100-₹120 per liter) → ₹450-₹600 per km.
- Electric versions have 30-40% lower operational costs compared to diesel.
2. Maintenance & Overhaul Expenses
- Vande Bharat: Higher maintenance costs due to its modern design (₹12-15 lakh per coach annually).
- Rajdhani & Shatabdi: ₹8-12 lakh per coach per year, with periodic overhauls every 6-8 years.
- Regular inspections, brake replacements, and bogie overhauls increase maintenance costs.
3. Staff Salaries & Operational Expenses
- Each train requires loco pilots, guards, onboard staff, and station personnel.
- Estimated salary expenses ₹2-3 lakh per day (including benefits and allowances).
- Catering and cleaning services add another ₹50,000-₹1,00,000 per trip.
4. Infrastructure & Track Maintenance Costs
- Dedicated high-speed tracks and overhead electrification systems are essential.
- Average track maintenance cost: ₹2-3 crore per km annually.
- High-speed corridors for Vande Bharat require superior upkeep compared to standard express routes.
Railway Jobs Alert! 1,036 Vacancies Available – Apply for Indian Railway Recruitment 2025!
RBI Penalizes Equitas Small Finance Bank & India Post Payments Bank – Here’s Why!
5. Ticket Pricing & Revenue Generation
- Vande Bharat: ₹1,000-₹3,000 per ticket (based on class & distance)
- Rajdhani: ₹1,500-₹4,500 per ticket (AC 3-tier, AC 2-tier, and 1st AC)
- Shatabdi: ₹800-₹2,500 per ticket (CC, Executive class)
- Higher occupancy rates help recover costs; Vande Bharat has an average occupancy of 95-100%.
6. Environmental Impact & Sustainability Measures
- Vande Bharat trains produce significantly lower carbon emissions than diesel-operated trains.
- Efforts to convert Rajdhani and Shatabdi Express to fully electric operations are ongoing.
- Indian Railways aims to be net-zero carbon emitter by 2030, prioritizing energy-efficient technologies.
7. Catering & Passenger Services Costs
- Premium onboard catering services add to operational expenses.
- Estimated cost per meal: ₹120-₹200, impacting ticket pricing.
- Rajdhani and Shatabdi fares include meals, while Vande Bharat uses an optional meal service model.
How Do These Trains Compare to Standard Express Trains?
Feature | Premium Trains (VB, Rajdhani, Shatabdi) | Standard Express Trains |
Speed | 110-160 km/h | 70-110 km/h |
Comfort & Amenities | High (WiFi, catering, luxury seats) | Moderate |
Ticket Pricing | ₹1,000-₹4,500 | ₹200-₹1,500 |
Operational Cost per km | ₹350-₹750/km | ₹200-₹500/km |
Revenue per km | ₹500-₹1,200/km | ₹300-₹600/km |
FAQs On What It Takes to Run Vande Bharat
Q1: Which train is the most cost-efficient?
Vande Bharat Express is the most cost-efficient due to lower energy costs (electric operation), despite higher maintenance expenses.
Q2: Why are Rajdhani and Shatabdi trains still in service?
They serve long-distance routes with partial electrification, making diesel locomotives necessary.
Q3: Can ticket sales fully cover the operating costs?
Yes, premium trains generate surplus revenue through ticket sales, but factors like subsidies and maintenance influence net profitability.
Q4: Will Vande Bharat replace Rajdhani and Shatabdi?
Over time, Vande Bharat could replace Shatabdi Express, but Rajdhani trains will likely continue operating on longer routes requiring sleeper berths.
Q5: What is the fastest train in India?
Vande Bharat Express holds the title, with top speeds reaching 180 km/h (testing phase) and operational speeds of 160 km/h.