
The Daulatabad Chowk on Dwarka Expressway has been closed for 44 days, from March 18 to April 30, 2025, for essential expansion joint replacement work. The closure, announced by the National Highways Authority of India (NHAI), affects daily commuters traveling from Gurugram sectors 99 to 106, Basai, Dhankot, and Kherki Majra, who frequently use this road to access Delhi, Dwarka, and the Indira Gandhi International (IGI) Airport.
Traffic Alert
Topic | Details |
---|---|
Closure Duration | March 18 – April 30, 2025 |
Affected Area | Daulatabad Chowk entry onto Dwarka Expressway |
Reason for Closure | Expansion joint replacement on the elevated carriageway |
Alternative Routes | Surface road after Bijwasan toll plaza, Najafgarh Road |
Impact on Commuters | Increased travel time, congestion on alternative routes |
Expected Delay | 20-30 minutes more than usual travel time |
Recommended Apps | Google Maps, Waze, Gurugram Traffic Police Twitter |
Official Announcement | NHAI Website |
The closure of Daulatabad Chowk on Dwarka Expressway for 44 days is an inconvenience, but it is necessary for long-term road safety. By planning ahead, using alternative routes, and staying updated with traffic advisories, commuters can minimize delays and navigate efficiently.
For the latest updates, visit NHAI’s official website or follow local traffic authorities on social media.
Why is Daulatabad Chowk Closed?
The closure is part of infrastructure maintenance work undertaken by NHAI to ensure the long-term durability and safety of the Dwarka Expressway elevated road. These expansion joints are crucial for absorbing structural movement caused by traffic load, temperature fluctuations, and other environmental factors.
While the work is necessary, the temporary shutdown has raised concerns among daily commuters, who now face traffic bottlenecks and longer travel times.
How This Closure Affects You
For thousands of daily commuters, this closure means increased travel time, rerouted traffic, and congestion on nearby roads. If you travel through Dwarka Expressway or Daulatabad Chowk, here’s what you should expect:
- Heavier traffic congestion on the alternative routes.
- Longer travel times for commuters heading towards Delhi, Gurugram, and IGI Airport.
- Public transportation delays, affecting bus services along this corridor.
- Increased fuel consumption due to longer detours and slow-moving traffic.
- Possible business disruptions for those relying on timely deliveries and travel along this route.
To minimize disruptions, planning your route in advance is essential.
Alternative Routes to Use
1. Surface Road After Bijwasan Toll Plaza (Recommended for Delhi-bound travelers)
- Vehicles coming from Dhankot and Basai should take the service road to merge back onto the Dwarka Expressway after the Bijwasan toll plaza.
- While this route is longer, it avoids the most congested parts of the closure area.
2. Najafgarh Road (Use with Caution)
- Commuters heading to Najafgarh and Delhi can take the Najafgarh road, but be prepared for poor road conditions and additional congestion.
3. NH-48 via Hero Honda Chowk (Best for those traveling between Gurugram and Delhi without using Dwarka Expressway)
- Travelers can take NH-48 from Hero Honda Chowk towards Delhi.
- While this option is heavily used, it provides a more structured route with better-maintained roads.
4. Rail and Metro Alternatives
- If feasible, use the Delhi Metro’s Airport Express Line or Blue Line to bypass road congestion.
- Gurugram Railway Station can be an alternative for intercity travelers.
Big Traffic Rule Update! Fines Hiked 10 Times – See Latest Challan Rates
Zero Toll Tax: Government’s New Toll Tax Rule, Are You on the Exempt List?
Practical Tips to Avoid Delays
- Leave Earlier: Factor in at least 20-30 minutes of additional travel time.
- Use Google Maps/Waze: Stay updated with real-time traffic conditions and suggested detours.
- Public Transport Alternatives: Consider using the Delhi Metro (Dwarka Sector 21 station) for a hassle-free commute.
- Carpooling or Ride-sharing: Reduce congestion by carpooling with colleagues or using ride-sharing apps.
- Check NHAI Updates: Follow NHAI and local traffic advisories for real-time updates.
- Use Traffic Police Twitter Handles: Gurugram and Delhi Traffic Police often provide real-time updates on diversions and congestion.
Frequently Asked Questions (FAQs)
1. Why is the closure lasting for 44 days?
The expansion joint replacement work on the elevated carriageway is a complex process requiring proper curing time and structural safety checks. This ensures long-term durability and safe travel conditions.
2. Are there any restrictions for commercial vehicles?
Currently, there are no specific restrictions on commercial vehicles. However, they are advised to use NH-48 via Hero Honda Chowk to avoid congestion.
3. Will public transport be affected?
Yes, local buses and shared auto services may experience longer routes and delays due to diversions.
4. Can I still use Dwarka Expressway from another entry point?
Yes, commuters can enter Dwarka Expressway from other intersections, but should expect delays.
5. Where can I check for real-time updates?
Follow the Gurugram Traffic Police on Twitter or check Google Maps for live updates.
6. Is there a way to escalate complaints about road congestion?
Yes, you can file complaints or suggestions on the NHAI website or call their helpline for assistance.
7. Will the repair work improve road quality?
Yes, the expansion joint replacement ensures smoother travel and longer-lasting infrastructure, reducing maintenance issues in the future.